PROJECT NAME: Provision of land and marine logistics, accomodation housekeeping and catering services.

Project Scope: The Provision of catering services, housekeeping and accomodation for over 120 personnel (Offshore). This covers the provision of accomodation, recreational facility, laundry facility etc. The provision of Tug boats, barges, flat beds, low beds and cranes. at ESCRAVOS.

PROJECT YEAR:  2023.

Project Status: Completed

CLIENT: SHELL PETROLEUM DEVELOPMENT COMPANY 

PROJECT NAME: Man power supply

Project Scope: Nil

PROJECT YEAR:  2023

Project Status: Completed

CLIENT: Antan Producing Limited

PROJECT NAME: Procurement and Supply of Gasket, 24″ 150 ANSI, Full Face Type, Stud Bolt with Nuts, 1 1/4 Inch X 180mm B7/2H

Project Scope: Procurement, Supply, storage and delivery of items and materials

PROJECT YEAR:  2022

Project Status: Completed

CLIENT: TotalEenergies Limited

PROJECT NAME: Procurement and Supply of Filter Element, Oil, Socket Outlet, 2 Pole + Earth, 16 Amp, 250VAC, PLEXO IP55,

Project Scope: Procurement, Supply, storage and delivery of items and materials

PROJECT YEAR:  2022

Project Status: Completed

CLIENT: TotalEenergies Limited

PROJECT: Procurement and Supply of Pressure Safety Valve, 1″ 300# RF X 2″ 150# RF, Valve, Solenoid 3/2, Ballast, EExed IIC T4/T5 Light Fitting, Filter, Element Turbine.

Project Scope: Procurement, Supply, storage and delivery of items and materials

PROJECT YEAR:  2022

Project Status: Completed

CLIENT: TotalEenergies Limited

PROJECT: Procurement and Supply of Refrigerant Dispose-A-Can 11.35k, Fan, Electric Motor, Operating Switch for CAPIC Oven Model, Switching Sequence:0-1-2-3 Capacity: 32A etc.

Project Scope: Procurement, Supply, storage and delivery of items and materials

PROJECT YEAR:  2022

Project Status: Completed

CLIENT: TotalEenergies Limited

PROJECT NAME: Construction of Retail Stations for Petroleum Products

Project Scope: Civil/structural, mechanical, electromechanical, electrical etc. works

PROJECT YEAR:  2021.

Project Status: Completed

CLIENT: SHELL PETROLEUM DEVELOPMENT COMPANY

PROJECT NAME: Construction of piping facilities and accommodation for the Abuja 1350MW Independent Power Plant Project

Project Scope: The scope covers but not limited to (a) Preparation of detailed plant and equipment layouts for main plant, utilities system and off-sites. (b) Construction and installation of pipes after piping studies, GADs isometrics, system drawings, various types of Piping specifications, IBR documents, CCOE drawings etc

PROJECT YEAR:  2021.

Project Status: Completed

CLIENT: NNPC (GAS AND POWER INVESTMENT COMPANY LIMITED)

PROJECT NAME: Procurement and Installation of Digital Interface Module for Centum, Battery 12 Volt 75 AH, Charge Controller for Solar Power Generator, Low Voltage Cable Range, Expansion Joint (Rubber Bellow), DELCOS Controller for Mobile Air Compressor, XL-SE/L etc.

Project Scope: Covers the procurement, supply, storage and delivery of required products. The construction and installation of all the procured materials at the various locations approved by he client

PROJECT YEAR:  2021.

Project Status: Completed

CLIENT: TOTAL E&P NIGERIA LTD.

PROJECT NAME: Construction of 10km Pipeline & Foundation for Pipe Slippers

Project Scope: Fabrication of piping of all sizes of carbon steel and stainless steel.
(a) Carrying out required NDT like Radiography, magnetic particle and dye penetration tests. (b) Assembly and Installation of piping including valves, instruments etc. at all elevations (underground piping or above ground. (c) Pressure testing of piping. (d) Coating and wrapping of underground piping. (e) Surface preparation and painting. (f) Revamping of piping by demolishing existing ones and installing new piping in its place.

PROJECT YEAR:  2018.

Project Status: Completed

CLIENT: Sterling oil exploration & energy production co. ltd

PROJECT NAME: Provision of Operation and Maintenance Services for Flow Station(S)

Project Scope: Operation & Maintenance activities of the Water system including the Fire water and;
(a) Maintenance of the Instrumentation, Control and Safeguarding systems including Fire and Gas
Detection Systems,
(b)  Management and operations of the Control Room with the associated Human Machine Interfaces
(HMI), Data acquisition and Control systems, Operation of the DCS – Distributed Control System
and supervisory computer.

PROJECT YEAR:  2016.

Project Status: Completed

CLIENT: SHELL PEROLEUM DEVELOPMENT COMPANY